District 5, Winnie Lane Reconstruction Project
Winnie Lane Reconstruction Project Documents
Carson City Public Works (CCPW), and the Transportation Division, are planning to reconstruct Winnie Lane between North Carson Street and Mountain Street. Located in Performance District 5, the project includes the full depth removal and replacement of the asphalt pavement along with required compliance with the Americans with Disabilities Act (ADA) to replace failing concrete sidewalk, and non-ADA compliant curb ramps and driveways.
Winnie Lane has a pavement condition index (PCI) of ‘Very Poor’ to ‘Serious’ as measured by recent pavement surveys. As such, the Carson City Regional Transportation Commission (RTC) allocated funding for the project in June 2022. Design was recently completed in October 2023. The project cost estimate is $1.47M.
CCPW estimates a construction start date March/April 2024 with completion date of mid-summer 2024. During construction, residents in the area should expect minor delays and periodic lane closures. Parking may also be restricted. It is the City’s goal to keep full road closures to a minimum, but there may be short periods of time that full closures may take place. Access to driveways may also be affected at times during construction. CCPW will require a future contractor to notify residents prior to blocking access to any residential or business driveways.
To see excerpts of the plans, please see the link below. If you have additional questions about the project and potential impacts to your property, please contact Brian Elder or Chris Martinovich at the contact information provided.
Brian Elder, PE Chris Martinovich, PE
Project Manager Transportation Manager
775-283-7586 775-283-7367